01-17-2018, 12:30 AM
(01-16-2018, 11:49 PM)Ryan97 Wrote: Im trying to add a route to an aircraft LGW-DME-LGW-IST-LGW. Its really annoying because it does the LGW-DME-LGW part fine and then does the LGW-IST-LGW for the next day. Am i doing something wrong? I have left at least 10 minutes between the ready at time and the departure time at each airport so i know thats not the issue
I was having something like, this, then I looked at staff, there was more leaving than employed, and the infrastructure was not available, upgraded the infrastructure and increased the employee percentages and they seemed to iron it out.
